Clauses

The following documents may not contain an authorized release signature within the body of the document or on the cover.  Please note:  these documents are authorized for use by David Trawinski, Director of the LM Aero Quality & Mission Success (Q&MS) Supplier Quality Management (SQM), as of the date shown.

 

Current Version Description / Archives

Q16 (PDF, 23.9 KB)

Engineering Directed Standard Tool/Perishable Tool Inspection Requirements
Q16 Revision Log
Archives: December 22, 2010, October 03, 2006; February 16, 2006; September 29, 2005; July 11, 2005; June 16, 2005

Q30 (PDF, 11.5 KB)

F35 Supplier Manufacturing Process Capability Measurement Plan Data Submittal
Q30 Revision Log
Archives:  February 11, 2011, March 12, 2009; September 28, 2005

Q1R (PDF, 5.7 KB) Quality Requirements – Commercial Conformity Certifications
Archives:
Rev. A, 05-01-1998

Q2R (PDF, 16.7 KB)

First Article Inspection
Q2R Revision Log
Archives:  August 15, 2005; April 1, 2003; March 1, 2003; April 20, 1998; June 6, 1997

Q2A (PDF, 14.1 KB)

Q2A-First Article Inspection (FAI)-AS9102A
Q2A Revision Log
Archives: October 17, 2012, September 12, 2011February 11, 2011 July 29, 2009; August 15, 2008January 16, 2008;  August 31, 2005August 15, 2005; June 1, 2004; July 1, 2003

Q2B (PDF, 36KB) Maintenance, Process Verification
Q3R (PDF, 20.2 KB)

Fit Check
Archives: Rev. 7  3-10-2011  Rev. 6, 04-01-2010Rev. 5, 02-15-2006, Rev. 4, 11-11-2004, Rev. B, 04-18-2001, Rev. C, 01-16-2001

Q4R (PDF, 11.6 KB)

Foreign Object Damage / Damage Prevention
Q4R Revision Log (PDF, 11.6 KB)
Archives: August 23, 2006; April 15, 2004 (PDF, 13.7 KB); April 18, 2003 (PDF, 11.5 KB); June 6, 1997 (PDF, 9.3 KB)

Q6R (PDF, 7.7 KB)

Software Quality Assurance
Archives:  June 16, 2010, Arpil 9, 1999

Superseded/Cancelled Documents

Q15

Supplier Tooling Manual -  Superceded by Appendix QX, latest revision

Q01 Certificate of Conformance  - Superseded By Appendix QX, latest revision
Q81 Software Quality Assurance – Superseded by Quality Clause Q6R, latest revision
Q7R Tooling Program Requirements – Superseded in its entirety by Appendix QX - latest revision
Q8R Variable Reduction Program – Cancelled effective 1-8-2007
Q9R Raw Material Process Certification and Test Reports – Cancelled effective
1-8-2007