Control Specs
The following documents may not contain an authorized release signature within the body of the document or on the cover. Please note: these documents are authorized for use by Larry Jans, Director of the LM Aero Quality & Mission Success (Q&MS) Supplier Quality Management (SQM), as of the date shown.
| Current Version | Description / Archives |
Component Acceptance and Documentation for Shipments Between Co-Producers |
|
| IQCS-440 | F-16 Co-Producer First Article Inspection Requirements |
| IQCS-460 | Employee Certification Requirements for International Contractors |
| IQCS-480 | Requirements for Materials Received from LMTAS or Other Coproducers/Suppliers. |
QCS-001 |
Controlled Processes and Approved Processors |
Appendix QJ (PDF, 61.3 KB) |
|
TMS MC 015 (PDF, 280 KB) |
Supplier Tooling Manual |
| Superseded/Cancelled Documents | |
| IQCS-189-2H (PDF, 913.3 KB) |
Requirements for Corrective Action and Control of Nonconforming Material at International Sources -Superseded in its entirety by Appendix QX – latest revision |
QCS-005 |
First Article Inspection (FAI) Requirements (JSF Only) Within 3D Model Verification Environment |
QCS-122 |
Preferred Distributor Terms and Conditions |
QCS-320 |
Manufacturer's Terms and Conditions |





