Control Specs

The following documents may not contain an authorized release signature within the body of the document or on the cover.  Please note:  these documents are authorized for use by James Sprouse, Director of the LM Aero Quality & Mission Success (Q&MS) Supplier Quality Management (SQM), as of the date shown.

Current Version Description / Archives


Component Acceptance and Documentation for Shipments Between Co-Producers
Archives: Original, 8/20/96

IQCS-440 F-16 Co-Producer First Article Inspection Requirements
IQCS-460 Employee Certification Requirements for International Contractors 
IQCS-480 Requirements for Materials Received from LMTAS or Other Coproducers/Suppliers.

(PDF, 9 KB)

Controlled Processes and Approved Processors


Appendix QJ (PDF, 61.3 KB)
QCS-001 Directory

QCS-170 Seller Quality Requirements for Control of Processes and Approved Process Sources – Superseded in its entirety by QCS-001

TMS MC 015 (PDF, 280 KB) 

Supplier Tooling Manual

Rev. 28 June 2013
Rev. 27 February 2012
Rev. 26 April 2010
Rev. 25 February 2009
Rev. 24 June 2008
Rev. 23 January 2008
Supplier Tooling Manual Changes

Superseded/Cancelled Documents
(PDF, 913.3 KB)
Requirements for Corrective Action and Control of Nonconforming Material at International Sources -Superseded in its entirety by Appendix QX – latest revision


First Article Inspection (FAI) Requirements (JSF Only) Within 3D Model Verification Environment


Preferred Distributor Terms and Conditions


Manufacturer's Terms and Conditions