After demobilizing for a long holiday break, construction crews began the New Year by continuing testing of building process equipment, communications and wiring.

Crews continued addressing painting, trim, tile, mechanical, and process area punch list items. Construction on aluminum walkways and handrails was also continued by contractors within the process area.

In the field, contractors began wrapping up installation of on-facility extraction well vaults, and continued installing well heads, pumps and wiring at the off-site structures. Personnel also continued communications testing and wiring at off-site control panel locations. Fencing restoration work on the Schmid Farm was substantially completed.

Next week, building crews will continue metal walkway handrail installation, instrument configuration, and process equipment testing. Crews will continue to address building punch list items in the process and office areas. In the field, crews will continue assembling and installing pumps and hardware in the wells and vaults, pulling wiring, and pressure testing conveyance lines. Contractors will continue demobilizing equipment and materials from the site.

As always, if anyone has any questions about these construction activities, please give me a call at 941-554-3862 or 1-800-449-4486 and I’ll do my best to get the appropriate answers to your questions.

12-20-12-0811-floor-coating-in-process-area-04-el
12-18-12-1645-tool-room-overview-cw
IMG_2785
IMG_2766
12-20-12-0809-floor-coating-in-process-area-03-el
12-18-12-1631-office-hallway-overview-cw
12-18-12-1629-southeastern-site-overview-cw
IMG_2775
12-18-12-1630-site-civil-work-overview-southeastern-portion-of-site-cw
12-18-12-1628-southern-site-overview-cw

gary-4

Gary Cambre                                                                                  Public Affairs         Sr. Communications Manager                                                     

12-07-12-1355-southern-site-overview-cw