Construction Activities Moving Forward


Friday, January 11, 2013

CONSTRUCTION ACTIVITIES MOVING  FORWARD

On the Lockheed Martin facility this week, crews continued  treatment system programming and testing process equipment and communications systems.  Installation crews completed construction of the aluminum walkways and handrails, and continued to address process area punch list items.

In the office area, the air conditioning system was started up in preparation for flooring installation. Crews also continued addressing painting, tile, fire alarm system, and office area punch list items. 

 In the field, we completed the installation of the last on-facility extraction well vault, and substantially completed installing well pumps and vault hardware. Crews also continued testing communications, addressing punch list items, and installing wiring at off-facility well vault and control panel locations.

Next week, building crews will continue testing process equipment and communications systems, and addressing punch list items in both process and office areas.

Field crews will continue installing off-facility wiring, protective bollards and shrubbery around several of the off facility structures, and addressing punch list items. Field contractors will begin demobilizing heavy equipment from the site. 

As always, if anyone has any questions about these construction activities, please give me a call at 941-554-3862 or 1-800-449-4486 and I’ll do my best to get the appropriate answers to your questions.

01-02-13-1358-backwashing-gac-units-cw
01-02-13-1540-frp-grating-in-trench-cw
01-02-13-1359-tool-room-painted-cw
01-02-13-1358-process-area-overview-cw
01-02-13-1359-office-hallway-overview-cw
01-02-13-1611-southwest-corner-of-process-building-penetrations-cw
01-02-13-1357-northwestern-site-overview-cw
01-02-13-1357-pulling-wire-on-north-side-of-treatment-building-cw
01-03-13-1335-southeastern-process-area-overview-cw

gary-4

Gary Cambre                                                                                  Public Affairs         Sr. Communications Manager                                                     

12-07-12-1355-southern-site-overview-cw