Crews Working Toward Construction Completion Goal


01-17-13-1715-southeastern-site-overview-cw

Friday, January 25, 2013

 
Crews Working Toward Construction Completion Goal

Following the Martin Luther King, Jr. holiday, work resumed on the Lockheed Martin facility with crews testing process equipment and instrument communications systems. Crews also installed floor grating in the chemical containment rooms, and continued to address process area punch list items, including piping and wiring.

In the office area, crews completed testing and startup of the building fire alarm system. Crews also continued addressing office area painting, door trim, lighting, and electrical punch list items.

In the field, crews continued installing protective bollards around off-facility structures near  control panel locations and began installing decorative shrubbery at some of the locations. Workers also tested communications, addressing punch list items, and installing wiring at off-facility well vault and control panel locations. 

Next week, field crews will continue addressing punch list items. Building crews will continue with testing process equipment and communications systems, operator training, and addressing punch list items in both process and office areas. The construction trailers are scheduled to be demobilized by the end of the week.

As always, if anyone has any questions about these construction activities, please give me a call at 941-554-3862 or 1-800-449-4486 and I’ll do my best to get the appropriate answers to your questions. 

01-15-13-1107-operator-office-overview-cw

01-17-13-1448-grating-in-loading-dock-cw

01-12-13-1444-ultrafiltration-skid-overview-cw

01-15-13-1117-water-softener-skid-and-t-500-cw

01-15-13-1106-process-area-overview-cw

01-18-13-0841-filter-feed-press-cw

01-18-13-1555-loading-dock-overview-cw

01-15-13-1108-tool-room-overview-cw

01-18-13-0842-western-man-door-cw

gary-4

Gary Cambre                                                                                  Public Affairs         Sr. Communications Manager                                                     

01-18-13-1555-eastern-site-overview-cw