In the mid-1990s, Lockheed Martin determined that industrial chemicals (solvents) from the Solvent Dock Area in the rear of the French Road building were moving through groundwater and entering the storm sewer system. Lockheed Martin installed a groundwater treatment system, which is still in operation and continues to meet all regulatory standards. Lockheed Martin is conducting a comprehensive remedial investigation to determine environmental conditions at the site, develop a plan to remediate the site if necessary, and implement a cleanup. NYSDEC issued an Order on Consent to Lockheed Martin effective October 3, 2008. The Order identifies areas of concern and requires the completion of certain investigation work, the development of proposed corrective measures, and the implementation of those measures after approval by NYSDEC.
Documents
2012
- Fourth Quarter 2012 Corrective Action Progress Report, January 2013
- Sub Slab Depressurization System Operations, Maintenance & Monitoring Report March 2012
- 2011 Annual Groundwater Collection & Treatment System Operation, Maintenance & Monitoring Report March 2012
- Annual Vapor Intrusion Study Report May 2012
- 2nd Qtr 2012 Corrective Action Progress Report
- 3rd Qtr 2012 Corrective Action Progress Report
- Evaluation Plan for SSDS Performance in Area of VMP-7A
- 1st Quarter 2012 Corrective Action Progress Report - April 2012
2011
- 2011 Annual Groundwater Monitoring Report - February 2012
- Waste Water Treatment Plant Monitoring Report - July 2011
- Second Quarter 2011 Corrective Action Progress Report - July 2011
- Annual Vapor-Intrusion Study Report - Revised July 2011
- Operation, Maintenance and Monitoring Plan, Sub-Slab Depressurization System - March 2011
- Groundwater Collection and Treatment System, Operation Maintenance and Monitoring Manual, Vol. 1 - March 2011
- Groundwater Collection and Treatment System, Operation Maintenance and Monitoring Manual, Vol. 2 - March 2011
- Monitored Natural Attenuation Plan - March 2011
- Post-Indicator Valve Repair Summary Report - March 2011
- Northern Perimeter Ditch Supplemental Investigation Report - March 2011
2010
- Fourth Quarter 2010 Corrective Action Progress Report
- Supplemental Investigation Work Plan for the Former Northern Perimeter Ditch
- Third Quarter 2010 Corrective Action Progress Report - October 2010
- Report on Final Closure Activities of the Wastewater Treatment Plant - August 2, 2010
- Second Quarter 2010 Corrective Action Report - July 2010
- Work Plan for Final Closure Activities of the Waste Water Treatment Plant - May 2010
- First Quarter 2010 Corrective Action Progress Report - April 2010
- Abandonment of Monitoring Well MW-8 - July 2, 2010
- Annual Vapor-Intrusion Study Report for the Solvent Dock Area - March 2010
- Groundwater Collection and Treatment System 100% Design Work Plan - February 2010
- Sub-slab Depressurization System, 100% Design Work Plan, Former Lockkheed Martin French Road Facility - February 2010
- Waste Water Treatment Plant Inspection Findings Report, Former Lockkheed Martin French Road Facility - February 2010
- Annual Post-Mitigation Vapor Intrusion Study - January 2010
- Fourth Quarter 2009 Corrective Action Progress Report - January 2010
- Supplemental Investigation Report - January 25, 2010
2009
- Site Management Plan 10 2009
- Third Quarter 2009 Corrective Action Progress Report
- Work Plan for Supplemental Investigation
- Quality Assurance Project Plan
- Second Quarter 2009 Corrective Action Report - July 2009
- First Quarter 2009 Corrective Action Progress Report
- Order on Consent, Index Number: 6-20080321-5 - April 2009
- Solvent Dock Area Factsheet
- Corrective Measures Study Report, March 2009
- Corrective Measures Study Report - June 2009
2008
- Tank Status Report, Revised Dec. 1, 2008
- Final Order on Consent, October 3, 2008
- Work Plan to Evaluate Performance of the Groundwater Collection and Treatment System, October 2008
- Revised Work Plan for the Interim Corrective Measure, April 2008
- Revised Work Plan for Soil and Groundwater Investigation, April 2008
- Addendum to the Vapor Intrusion Study Report, February 2008
2007-1995
- Vapor Intrusion Study Report, August 2007
- Vapor Intrusion Study, April 2006
- Phase I Environmental Site Assessment, French Road Facility, October 1995
- Storm Sewer Investigation, May 1995




Click here for the Solvent Dock Area Fact Sheet