Tallevast, Florida Interim Source Removal (ISR)
On August 3, 2008, approximately 5,000 gallons of recovered groundwater were inadvertedly released from a secondary containment unit that is part of the groundwater treatment system at the former ABC facility site. The following documents detail how Lockheed Martin discovered and treated this problem.